AZCO is contracted to install balance of plant piping systems for the new Plant Barry CCR / ELG Project in Bucks, Alabama. AZCO’s work includes the pipe trench piping installation from the SCR to the RSCC building, including the HP, IP, and LP water piping installation, as well as the basalt and potable water piping. Overall footage of installed piping is approximately 24,000 LF.
In addition to the piping installation, AZCO is also responsible for installing the mechanical equipment including overflow pumps, washdown water pumps, hydraulic drive pumps, caustic storage tank and pump, as well as numerous small skids.