To access the POWER-GEN International 2018 Online Conference Proceedings, please follow these instructions:

  1. Either scroll down to locate the session or presentation you are interested in or use the Advanced Search to find the Track or Speaker you are interested in
  2. Click the Adobe Acrobat icon to view the papers and presentations
  3. A pop up box will appear requesting the case-sensitive User Name and Password

Please note:  The POWER-GEN University Pre-Conference Workshop workbooks are

not included with the Online Conference Proceedings.

AZCO INC.

Appleton,  WI 
United States
http://www.azco-inc.com
  • Booth: 2931

Nationwide power plant construction and maintenance, turbine/generator installations, boiler erection and rebuilds, pipe fabrication and installation, material handling and environmental compliance equipment installation.

Brands: power plant construction and maintenance, boiler erection, pipe fabrication and installation, material handling and environmental compliance equipment installation


 Products

  • Hu Honua BioEnergy Biomass Boiler Installation
    30MW Biomass Boiler Installation including back-pass to the economizer, structural steel, and installation of turbine and generator....

  • AZCO is contracted to install the 30MW Biomass Boiler inclusive of the back-pass through the economizer, as well as related structural steel. The backend work is inclusive of the ESP, SCR, air heater, filter house, stack, ductwork, and structural steel.  This includes the bottom ash conveyor handling system and load-out facility.  The fuel yard handling system includes conveyors, reclaimers, chippers, and support steel installation. AZCO is also installing the steam turbine and generator as well as providing final alignments.

  • Black & Veatch Barry Steam Plant
    BOP Piping System Installation, Mechanical Equipment Installation...

  • AZCO is contracted to install balance of plant piping systems for the new Plant Barry CCR / ELG Project in Bucks, Alabama.  AZCO’s work includes the pipe trench piping installation from the SCR to the RSCC building, including the HP, IP, and LP water piping installation, as well as the basalt and potable water piping. Overall footage of installed piping is approximately 24,000 LF.

    In addition to the piping installation, AZCO is also responsible for installing the mechanical equipment including overflow pumps, washdown water pumps, hydraulic drive pumps, caustic storage tank and pump, as well as numerous small skids.
  • Southern Company Mankato Energy Center Unit 2
    General Contractor for New Combustion Turbine and HRSG onto the existing Mankato Power Plant....

  • AZCO INC. is the General Contractor for the installation of a new combustion turbine and HRSG onto the existing Mankato Power Plant.

    Scope of work includes the installation of the combustion turbine, generator, and heat recovery steam generator unit. This includes installation of BOP piping, HRSG piping, CTG installation, stack installation, HVAC, instrumentation, structural steel pipe rack, electrical, and insulation.